Factory rooftops · Durrës County · Albania

Factory rooftop solar in Sukth: 151,200 kWh a year on 100 kWp

A 100 kWp array on a factory roof in Sukth generates about 151,200 kWh a year at the local specific yield of 1,512 kWh/kWp. Factories are a better solar match than most commercial buildings because process loads, compressed air and HVAC run through the same daylight hours the array is producing.

With roughly 70% self-consumed against €0.16/kWh, that output is worth about €16,934 a year and pays back in around 5.3 years on an installed cost near €90,000. Strong local irradiance plus daytime process load is why factory rooftops in Sukth are usually faster to close than speculative warehouse pitches.

Industrial estates around Sukth sit in the same Durrës County band as Durrës, Shijak and Manëz. What changes site to site is roof area, shading from plant rooms, and whether the factory runs a true day shift. SolarScout flags those roofs from satellite and OpenStreetMap rather than from a bought list.

151,200 kWh
Annual output (100 kWp)
5.3 yrs
Est. payback
1,512 kWh/kWp/yr
Specific yield
€16,934
Annual savings

Turn these rooftops into a lead list in minutes.

Scan this area free →

Why factory roofs in Sukth self-consume more than warehouses

A quiet distribution shed may export a large share of midday generation. A factory in Sukth typically does not: motors, ovens, plating lines or refrigeration pull power while the sun is up, so a higher share of the 151,200 kWh stays behind the meter and the 5.3-year payback holds.

That is the conversation to open with — not "solar is green", but "this roof in Sukth offsets about €16,934 a year at today's tariff of €0.16/kWh".

What to inspect on a Sukth factory roof

Look for large, low-pitch structural roofs with few roof lights, limited HVAC clutter, and a south or east-west run that matches Durrës County's 1,512 kWh/kWp resource. North-light sheds and heavily plant-loaded roofs still work, but usable kWp drops and payback stretches past the 5.3-year city example.

SolarScout estimates footprint first, then (where Google Solar data exists) modelled annual kWh, so you can skip the roofs that will never carry a 100 kWp array and spend time on the ones that will.

How to turn Sukth factory roofs into a lead list

Scan Sukth in SolarScout and filter for factories. Each row carries an estimated roof area, a worked saving at €0.16/kWh, and contact fields where map data provides them. Export CSV or Excel and drop the list into your CRM.

When Sukth is thin, run the same scan on Durrës, Shijak and Manëz — they share the Durrës County yield, so the economics stay comparable and you are not mixing a sunny coast with a cloudy hinterland.

Frequently asked questions

How much can a factory rooftop in Sukth generate?

About 151,200 kWh a year on a 100 kWp array. That is 100 kWp multiplied by Sukth's specific yield of 1,512 kWh/kWp; larger roofs scale linearly until structure, shading or grid export caps the design.

What payback does factory rooftop solar see in Sukth?

Around 5.3 years when most of the generation is used on site. Factories usually beat empty warehouses on that score because daytime process load matches the solar curve.

How does SolarScout find factory rooftops in Sukth?

It combines OpenStreetMap industrial building tags with satellite imagery and, where available, Google Solar modelling — then exports Sukth factories as leads with roof area and a €16,934/year worked example on 100 kWp.