Payback · Andalusia · Spain

Commercial solar payback in El Ejido: 3.3 years

A self-consuming 100 kWp array on a commercial roof in El Ejido typically pays back in about 3.3 years. That figure uses El Ejido's specific yield of 1,767 kWh per kWp per year and a commercial tariff near €0.22/kWh, with 70% of generation used on site.

At that yield the array produces about 176,700 kWh a year and saves roughly €27,212 annually against an installed cost near €90,000. Over 25 years the net saving is around €590,300, while avoiding about 61.8 tonnes of CO₂ each year.

El Ejido is in Andalusia, alongside Seville, Málaga and Córdoba. Those towns share the same irradiance zone, so payback is similar — the difference is which warehouses and factories still have empty roof. SolarScout lists them with a pre-computed business case rather than a generic "solar is cheap" pitch.

3.3 yrs
Est. payback (100 kWp)
1,767 kWh/kWp/yr
Specific yield
€0.22/kWh
Local tariff
€27,212
Annual savings

Turn these rooftops into a lead list in minutes.

Scan this area free →

How the El Ejido payback number is calculated

Start with 100 kWp × 1,767 kWh/kWp = 176,700 kWh of annual production on a representative warehouse or factory roof in El Ejido. Apply 70% self-consumption against €0.22 per kWh and you get about €27,212 a year. Divide the €900/kWp installed cost (€90,000 for 100 kWp) by that saving and payback lands at 3.3 years.

This is a worked example, not a quote. Real payback moves with self-consumption, shading, export tariff and installed cost. It is still the right first filter: if a roof in El Ejido cannot beat roughly 3.3 years on these inputs, it is probably not a priority lead.

El Ejido versus the rest of Spain

Relative to Spain as a whole, payback in El Ejido is about 0.5 years faster than the Spain average of 3.8 years. Spain has Europe’s strongest solar resource. High specific yields on industrial estates and logistics parks make commercial rooftop solar one of the best-returning energy investments on the continent.

That is why outreach in El Ejido should open with the local number — 3.3 years and €27,212 a year on 100 kWp — not a national average that under- or over-sells the roof.

What actually changes payback on a El Ejido roof

Yield is already baked into the 1,767 kWh/kWp zone for Andalusia. The bigger swings are usable roof area, daytime load (factories and cold stores self-consume more than empty warehouses) and whether the site pays the full €0.22/kWh commercial rate.

SolarScout estimates roof footprint from satellite and map data and, where Google Solar coverage exists, modelled annual output — so you can rank El Ejido sites by savings instead of guessing from a map pin.

Frequently asked questions

What is the commercial solar payback in El Ejido?

About 3.3 years for a self-consuming 100 kWp rooftop in El Ejido. That uses 1,767 kWh/kWp of local yield and a tariff near €0.22/kWh, saving around €27,212 a year.

How much electricity does 100 kWp produce in El Ejido?

Around 176,700 kWh a year. Multiply the 1,767 kWh/kWp specific yield for Andalusia by 100 kWp; shading and orientation can move that figure, which is why SolarScout models each roof rather than stopping at the city average.